OSV BUOY MAINTENANCE

LOCATION Offshore – Egypt
DATE STARTED Jul. 2022
ASSETS PROVIDED
  • OSV
  • VESSEL CRANE
  • A-FRAME
  • VESSEL WINCHES
SERVICES PROVIDED

Annual maintenance of Conventional Buoy Mooring (CBM) System at EPP terminal, offshore Egypt.

  • Six buoys were lifted on deck using the vessel’s A-Frame and winch
  • 10T clump weights were washed
  • Mooring chains and buoys were inspected and serviced accordingly
  • Installation of secondary anchoring system to minimise attrition
  • Hand scraping and pressure washing of entire structure internally and externally
  • Re-greasing of all moving parts
  • Hydraulic system and quick release hooks inspection and testing
  • Anode replacement
  • Metal repairs and strengthening as required.
  • Solar panel inspection and repair
  • Relaunching of buoys to original position